| Installation of 13 S.E.E.R. Tap pan A/C with new line set(copper lines that carry freon), pad, whip and disconnect box. |

| Attic Installation-92% Eff horizontal Furnace |
| Installation of a complete system. This is a Tap pan 92% Eff. gas furnace simply turned on it's side to accommodate the space that was provided. It was complete with A/C and all insulated ductwork. |

| Air Conditioner Installation |
| Ductwork For Above Photo |
| Installation of ductwork with all insulation and all our duct systems have rigid hard pipe(no flex ducts).Also on this install we taped all seems to get maximum Efficiency. |

| Furnace Installation Installation of new 80% Ameristar (made by American Standard) furnace with new Honeywell power humidifier and new Honeywell electronic air cleaner. |

| High Efficiency Furnace Installation of new Westinghouse 92% Eff. furnace. This was a basic installation with a optional humidifier. Notice the 2 PVC pipes coming from this furnace, one is to let combustion air in to burn, and the other is to exhaust fumes or flue gases out. |

| Hot Water Boiler Installation Installation of new Peerless Hot Water Boiler with all necessary pipping. Also replace water feeder and expansoin tank. Upgrade any gas or electric that may be needed. |

| Steam Boiler Installation Installation of New Yorker brand steam boiler with all new controls including electric water feeder and electric low water cut off. Take notice to the fact that there is no copper pipe on this boiler, steam boilers must be pipefitted with black pipe only. On all of our steam boilers we re-pipe the hartford loop because it is usually where the most rot on the boiler is and is likely to fail even with a new install and its usually not positioned in the right height on the new boiler. |




