Installation of 13 S.E.E.R. Tap pan A/C
with new line set(copper lines that carry
freon), pad, whip and disconnect box.
Attic Installation-92% Eff horizontal Furnace
Installation of a complete system. This
is a Tap pan 92% Eff. gas furnace
simply turned on it's side to
accommodate the space that was
provided. It was complete with A/C and
all insulated ductwork.
Air Conditioner Installation
Ductwork For Above Photo
Installation of ductwork with all insulation and all
our duct systems have rigid hard pipe(no flex
ducts).Also on this install we taped all seems to
get maximum Efficiency.
Furnace Installation
Installation of new 80% Ameristar (made by
American Standard) furnace with new Honeywell
power humidifier and new Honeywell electronic
air cleaner.
High Efficiency Furnace
Installation of new Westinghouse 92% Eff.
furnace. This was a basic installation with a
optional humidifier. Notice the 2 PVC pipes
coming from this furnace, one is to let
combustion air in to burn, and the other is to
exhaust fumes or flue gases out.
Hot Water Boiler Installation
Installation of new Peerless Hot Water Boiler with all
necessary pipping. Also replace water feeder and
expansoin tank. Upgrade any gas or electric that
may be needed.
Steam Boiler Installation
Installation of New Yorker brand steam boiler with all
new controls including electric water feeder and
electric low water cut off. Take notice to the fact that
there is no copper pipe on this boiler, steam boilers
must be pipefitted with black pipe only. On all of our
steam boilers we re-pipe the hartford loop because it
is usually where the most rot on the boiler is and is
likely to fail even with a new install and its usually not
positioned in the right height on the new boiler.
Suburbs: 708-497-5464          City: 773-573-5434